An electrical extravaganza for presidential inauguration

Due to the nature of this prestigious affair, strict criteria and protocol had to be adhered to. Says Kevin Hughes, chief operating officer of Oasys Electrical: “Stringent health and safety regulations were essential. SANS 10142 compliance is non-negotiable. All installations were checked by government nominated inspectors and engineers ensuring that all installations were of the highest standard.”
The company installed electrical infrastructure, including all lighting, connection of air conditioners and all plug points at the accreditation centre at the Pretoria Art Museum. The highlights of the project were the installations at the Presidential Guest House. Three large dining marquees for high-level foreign and local dignitaries who attended the inauguration had to be equipped with chandeliers, house lights, outdoor flood lights, power points and much needed air conditioning due to the large number of people in attendance.
Included in the project were power points for the kitchen marquees to supply power to all the catering equipment and general lighting. All power for the event was connected through generators and UPS systems to ensure an uninterrupted source of power for the event.
- GL events gears up for a peak season of outdoor events06 Oct 13:56
- Choosing the best printing, branding and signage company near you22 Jun 12:23
- Looking to hire a marquee for your outdoor event?09 Nov 09:47
- GL events South Africa launches a Retail division02 Sep 12:34
- 8 things to consider about mall activations08 Mar 10:29













