"Our maintenance schedule aligns with the highest global cableway standards set by the Swiss Governing Body for Cableways (BAV)," says Emile Streicher, the Cableway’s technical manager.
"According to this standard, the cars require an overhaul every six years because they carry a load at high altitude. Similarly, the heel and haul ropes have a limited lifetime."
The team will also service the main gearbox, generators, backup generators, and conduct electrical drive, hydraulics and brake system maintenance.
The Cableway’s managing director Wahida Parker encourages South Africans, 18 years and older, who celebrate their birthday within the closure period to redeem their complimentary Cableway ticket one week prior (1–7 July) or one week after (19–25 August) the maintenance period.
The 3-for-1 Kidz Season special will also be available to locals before and after the maintenance period until 30 September 2019.