China lends Zimbabwe US$319,5m to ease power deficit
"The bank will provide funding of US$319.5m while the government will finance the balance, amounting to $35.5 million," said Finance Minister Patrick Chinamasa after signing the deal with the bank's vice-president Zhu Hongjie.
Chinamasa said the loans would be repaid at two percent interest per year, with a grace period of five years and repayment period of 20 years.
The money will be used to increase the Kariba South Hydro-power station's capacity by 300 megawatts. Zimbabwe generates 1,200 megawatts of power on average a day against a peak demand of 2,100 megawatts.
To conserve scarce electricity the country's power utility resorts to long hours of load-shedding, in some cases lasting up to 10 hours in major cities.
Zimbabwe has forged close economic ties with China after falling out with the West. The European Union and the United States imposed sanctions that included a travel embargo and an asset freeze on veteran President Robert Mugabe and his close allies after the presidential elections in 2002 were condemned as flawed by western monitors.
Source: AFP via I-Net Bridge
Source: I-Net Bridge
For more than two decades, I-Net Bridge has been one of South Africa’s preferred electronic providers of innovative solutions, data of the highest calibre, reliable platforms and excellent supporting systems. Our products include workstations, web applications and data feeds packaged with in-depth news and powerful analytical tools empowering clients to make meaningful decisions.
We pride ourselves on our wide variety of in-house skills, encompassing multiple platforms and applications. These skills enable us to not only function as a first class facility, but also design, implement and support all our client needs at a level that confirms I-Net Bridge a leader in its field.
Go to: http://www.inet.co.za