
Top stories

Marketing & MediaThe 5 ways smart marketers balance brand and performance
Rirhandzu Shingwenyana 15 hours



Marketing & MediaiPendoring 2026 opens: Indigenous-language work gets a direct One Show shot
16 hours


More news









The first phase is complete - an extension of Shoprite – while phase two (a new Pick n Pay) is due to open in December 2017.
Louis Pretorius, MDS Architecture’s partner and lead on the project, says that by the end of 2017, about half of the building will be enclosed, all shopfronts will be replaced and the building will feature new external cladding. Kwagga Plaza will get a complete facelift. Old face brick facades will feature steel cladding and continuous shopfronts, creating a thoroughly modern feel. Three new entrances will be built, as will water tanks and a new sewerage plant.
The taxi rank is being repositioned and food outlets are being concentrated in a food court. Additional parking has been created as a result of breaking down a number of blocks. “Over the years, a number of extra blocks were added to the plaza at various levels. Added to this, the site has a large fall, which turned out to be quite a design challenge,” said Pretorius.